Information to be provided by the Subcontractor Along with the Crane Lift Plan (CLP):
The Sub-contractor is also accountable/answerable for the training of all workforce involved in the use of the following crane lifting operations:. The Sub-contractor is accountable and responsible to get all information that is mandatory to establish a Power Line Safety Plan (PLSP). The sub-contractor is accountable for determining adequacy, supplying and installing for all supporting material & substances as described within. This information is also given as part of the construction documents. The sub-contractor is accountable to visit the worksite before the lift date to review crane setup location and documentary information relevant to the worksite, which is managed by (COMPANY). Modification affecting crane configuration and/or location may need the Crane Lift Plan (CLP) to be modified.
The task or work that is not foreseen in the Crane Lift Plan (CLP), but may arise due to worksite circumstances e.g., moving heavy machinery, equipment, loading materials ground level floors must be abstracted with (COMPANY) in advance.The capacities shall be marked and legible on all such lifting devices/machinery. may be sufficient with appropriate PE stamp or proof testing as needed by required and applicable standards. Custom-Fabricated Devices (CFB) such as lifting beams, spreader bars, etc.All rigging machinery, equipment or devices should carry the name of the manufacturer and disclose WLL and be accredited as to their capacity.Utilized a variety of lift plans for various locations.
The Lift Plan should be valid for more than one day, as long as the composition, locale, and parameters utilized for developing “worst case” condition have not altered. gross chart capacity) for each particular crane composition and location and activity (e.g., unload a delivery vehicle is contrary to the erecting steel activity). Crane Lift Plans (CLP) must be established on worst case % of capacity (for example. If lifting is required, then Crane Lift Plans (CLP) must be acknowledged at least 48 hours before the machine mobilization and in case of any critical and helicopter lifts, 5-five days before should be submitted. In the case of Critical Crane Lifts (CCL), if authorized, may have to be analyzed by a competent, certified and professional engineer. A Crane Lift Plan (CLP) is needed for every crane lift on a (Company). Crane Lift Planning Process has two Parts-Crane Lift Plan & Crane Daily Safety Review Instructions